Before & After gallery:

Stove Installations by Casa

Recent Stove, Fireplace & Mantlepiece installations in South London carried out by Casa, HETAS Wood Burning Stove installers London.

Experience the craftsmanship of our team as they transform homes with beautiful and functional heating solutions.
Our highly experienced team of Hetas Registered Stove Installers guarantees the highest standards when fitting all stoves.
Simply read our Log Burner Installation Process > & choose the stove option on our contact form page > to receive a precise quote for Wood Stove or Fireplace Installation, rounded to the nearest £100.00. The contact form page provides easy prompts to guide you through the process.

All
  • All
  • Stove Installations
  • Mantelpiece Installations
  • Fireplace Installations
  • CCTV Inspection prior to installation

Wood Stove Installation in Clapham, South West London

Job Duration:
2 days
Location:
Clapham London
Installation Process:
Quoting from Clients Images
Sweep and CCTV Inspection - to ensure a flue liner and stove can be fitted
Working with Fellow Trades
Preparing the opening and fitting flue liner whilst scaffolding up
Finishing installation, commissioning stove
Read More About This Installation >

Wood Stove Installation Freshens 1930’s Fireplace in Croydon

Job Duration:
3 Days
Location:
East Croydon
Installation Process:
Sweep and CCTV Inspection Prior to stove installation.
1930's stone fire cut out and builders opening created with flue liner fitted.
Brickwook inside chamber had a small hole to outside world so hole had to be filled and flexible render applied.
Chamber and Hearth tiled which freshens up the old 1930's fireplace.
Stove connected to flue liner and sealed. Checks done, ready for Commissioning.
Read More About This Installation >

Wood-Stove Replaces Fire-Basket Installation in Bromley

Job Duration:
2 Days
Location:
Bromley, Kent
Installation Process:
Sweep and CCTV Inspection Prior to stove installation
Creating opening for new stove, supporting lintel fitted
Flue liner fitted, prep work for rendering done
Hearths laid, render completed with bespoke throat plate made and fitted
Stove connected to flue liner and sealed. checks done, ready for Commissioning
Read More About This Installation >

Wood-Stove Fitting with Beam in Nunhead, London (pt 2)

Job Duration:
2 days
Location:
Nunhead, Peckham, London
Installation Process:
Chimney Sweep & CCTV Inspection
Creating the opening for the wood burner fitting flue liner
Fitting flue liner, hearths and render miss-coat
Finishing render, connecting stove and fitting beam
Commissioning new stove with client - Decorator to lightly sand and finish off paint work
Read More About This Installation >

Sweep and CCTV Inspection in Nunhead, London – Prior to Stove with Beam Installation (pt 1)

Job Duration:
2 - 2 1/2 hours
Location:
Nunhead, SE15 London
Installation Process:
Clients Images sent via the enquiry form on the Casa Website for a New Stove installation
Vent Removed exposing solid concrete
Boring tool used to create opening for sweep and CCTV inspection through sheets
Sweep rods showing through from chimney pot, CCTV stills of chimney flue and smoke check
Work area left tidy, hole patched over, sweep certificate and findings explained to client
Read More About This Installation >

New Wood-Stove and Mantelpiece Replaces Old Fire in Norwood, London

Job Duration:
2 days
Location:
Norwood, London
Installation Process:
Old Fireplace (which was ultimately salvaged and restored)
Sheeting up for sweep and cctv inspection
Chimney sweep rods through the chimney pot
old fireplace removed, builders opening made, flue-liner fitted
Hearths, render and mantelpiece in place with stove fitted
Read More About This Installation >

Wood-Stove & Mantelpiece Installation with Scaffold in Camberwell, London

Job Duration:
2 Days
Location:
Camberwell, London
Installation Process:
Chimney Sweep & CCTV Inspection
Old fireplace removed & liner fitted
New chimney pot and anti-down draft cowl fitted (Scafold required to reach the Chimney stack).
Mantlepiece & Stove Fitted
Commission New Stove & Show Client how to operate
Read More About This Installation >

Up-Cycled Original Bedroom Fireplace Installation in Herne Hill, London

Job Duration:
1 Day
Location:
Herne Hill London
Installation Process:
Book-Case transformed into gorgeous feature
Up-cycled original Edwardian period fireplace
Limestone Marble Mantelpiece
Decorative Bedroom Fireplace
Reclaimed, recycled, up-cycled, period house feature
Read More About This Installation >

Wood Burning Stove & Mantelpiece Installation in Eltham, London

Job Duration:
2 days
Location:
Eltham, London
Installation Process:
Chimney Sweep & CCTV Inspection
Gas Fireplace disconnected and capped by Gas-Safe Engineer
Sweep and CCTV Inspection
Builders opening created and rendered, flue liner fitted and stove connected
Marble mantelpiece, slips and header fitted, stove commissioned
Read More About This Installation >

Remove Cast-Insert and Install Stove (mantelpiece remains in place) in New Cross, London

Job Duration:
2 Days
Location:
New Cross, London
Installation Process:
Chimney Sweep & CCTV Inspection
Cut Out the old Cast-iron Insert
Keeping mantel intact & hearth protected
Fit Flue-liner and connect to new eco-stove
Commission New Stove & Show Client how to operate
Read More About This Installation >

Wood-Stove Replaces Edwardian Fireplace in Crystal Palace, London

Job Duration:
3 Days
Location:
Crystal Palace, London
Installation Process:
Chimney Sweep & CCTV Inspection
Remove Edwardian Fireplace & Create a squared opening
Scaffold required to Fit Flue Liner
Hearth and Beam fitted, chamber rendered & Painted
New Stove commissioned & Client shown how to operate
Read More About This Installation >

One Day Wood Burning Stove Installation in Forest Hill, London: The Plug & Play

Job Duration:
1 Day
Location:
Forest Hill, London
Installation Process:
Chimney Sweep & CCTV Inspection
Fit New Flue Liner
Remove raised plinth - level back base of chamber to height of front hearth
Plug Flue Liner into new stove.
New Stove commissioned & Client shown how to operate
Read More About This Installation >